Complete renovation of sports park including:
• Demolition of existing asphalt pathways, (12) dugouts, batting cages, site concrete, rip rap, and 2 concession building interiors including old kitchen equipment.
• Major grading modifications for drainage and site improvements.
• Renovation of 2 concession building interiors including new doors, flooring, cabinets, stainless steel counter tops, paint, and kitchen equipment.
• Construction of masonry ADA restroom addition to North concession building.
• Complete removal and reinstallation of existing 360 degrees wrap around deck to accommodate ADA access.
• Installation of new trex deck ramp to reinstalled 360 degrees wrap around deck for ADA access.
• Installation of new steel hand/guard rail around both concessions building 360 degree wrap around decks, new ramps, and elevated concrete pathways.
• Installation of new concrete pathways park wide.
• Installation of new LED pathway/area light poles.
• Installation of 2 gravity block site retention site walls
• Installation of masonry column sign posts with powered entrance signs. • Installation of wrought iron security fence at park entrance.
• Modification to ticket teller booth to include new station with pass through.
• Installation of new Playground
• Construction of (12) new softball dugouts & associated fencing.
• Modification to existing softball fencing.
• Demolition of failing concrete bleachers, reconstruction of bleachers to match original.
•Exterior Paint of all structures, steel, and security fencing.
• Installation of 2 grass / turf areas
• Installation of complete Irrigation system to 6 softball fields including outfields and infield dust control, 1 multi-purpose field, and 2 recreational areas
• Installation of Seedless / Thorn less Mesquite trees
• Installation of grouted rip rap